Infrastructure
₦1.8 Billion (Phases 1 & 2) Budget

Hostel Renovation

A two-phase rehabilitation of student hostel blocks, bringing plumbing, electrical systems, security and comfort up to a modern standard.
Roofing works underway on a hostel block
The School Today

Current State

An honest look at this area of the school as it stands today. This is the starting point every project on this page is measured against.
Roofing works underway on a hostel blockA multi-storey residential block under constructionAerial view of the school campus and groundsHigh-voltage transmission pylons at sunset
Project Scope
✓Structural and roofing repairs
✓Full plumbing replacement
✓Electrical rewiring and lighting
✓Sanitary and washroom upgrades
✓Security and access improvements
Expected Outcomes
2
Delivery phases
100%
Of blocks brought to modern standard
↓
Improved student welfare and retention
The Vision
A preview of what this project aims to achieve once fully delivered.
Roofing works underway on a hostel block
The Problem
Deteriorating structures and roofing across hostel blocks
Failing plumbing and sanitary facilities
Unsafe and outdated electrical installations
The Solution
Phased structural and roofing rehabilitation
Complete replacement of plumbing and sanitary fittings
Full rewiring to modern electrical standards
Related causes

Building Lives Together

High-voltage transmission pylons at sunset
Power & Energy
₦1.5 Billion

Power Infrastructure Development

A hybrid solar, gas-backup and smart-grid power system designed to give FGC Kano guaranteed, uninterrupted electricity for the first time in its history.
Workers laying water pipes in an open trench
Self-Sufficiency
₦300 Million

Water Treatment & Reticulation System

Borehole rehabilitation, an industrial-grade treatment plant and a smart reticulation network that guarantee clean, continuous water across the campus.