10-Year Master Plan

Our Projects

Eleven workstreams from the Foundation’s programme, covering power, water, housing, technology, agriculture, sports and security. Every project below addresses a real institutional challenge with a costed, phased solution. Click any project to see the full problem, solution, scope and projected outcomes drawn from the Foundation’s 10-Year Master Plan.

High-voltage transmission pylons at sunset
Power & Energy
₦1.5 Billion

Power Infrastructure Development

A hybrid solar, gas-backup and smart-grid power system designed to give FGC Kano guaranteed, uninterrupted electricity for the first time in its history.
Workers laying water pipes in an open trench
Self-Sufficiency
₦300 Million

Water Treatment & Reticulation System

Borehole rehabilitation, an industrial-grade treatment plant and a smart reticulation network that guarantee clean, continuous water across the campus.
Roofing works underway on a hostel block
Infrastructure
₦1.8 Billion (Phases 1 & 2)

Hostel Renovation

A two-phase rehabilitation of student hostel blocks, bringing plumbing, electrical systems, security and comfort up to a modern standard.
A modern classroom with movable desks and a whiteboard
Education
₦400 Million

Classroom Modernization

Smart classrooms with interactive learning boards, better ventilation and wireless connectivity, replacing obsolete teaching spaces across the school.
A teaching room with a large wall-mounted display screen
Technology
₦500 Million (+ ₦1B expansion)

ICT Innovation & Research Hub

A Tier-3 compliant data center and research hub that doubles as a revenue-generating technology training and certification center.
A hand presenting an access card to a door reader
Digital Governance
₦250 Million

Digital Security & Access Control

Biometric registration, facial recognition and campus-wide CCTV bring real-time accountability and safety to every gate, hostel and facility.
A multi-storey residential block under construction
Staff Welfare
₦6 Billion (3 Phases)

Staff Housing Development

Vertical residential blocks replacing inefficient bungalow-style quarters, designed to attract and retain the quality of staff the school needs.
A modern science laboratory interior with instruments
Academics
₦1 Billion

Laboratory & Workshop Modernization

Fully modernised science laboratories and technical workshops, including a renewable energy lab and a robotics workshop.
A tractor ploughing farmland
Revenue Generation
₦300 Million (+ ₦1B industrialization)

Agricultural Development & Food Security

Unused school land converted into productive crop and livestock farming, cutting feeding costs while teaching real agribusiness skills.
Students learning to use sewing machines with an instructor
Vocational Training
₦200 Million (+ ₦1B expansion)

Skills Acquisition Center

A commercial-model training center teaching welding, solar installation, fashion design and digital fabrication to students and the wider public.
A football stadium pitch and covered stand
Commercialization
₦2 Billion (+ ₦1B expansion)

Modern Sports Arena Development

A FIFA-standard football field, Olympic-grade pool and commercial-grade sports infrastructure designed to make FGC Kano a regional sporting destination.