Power & Energy
₦1.5 Billion Budget

Power Infrastructure Development

A hybrid solar, gas-backup and smart-grid power system designed to give FGC Kano guaranteed, uninterrupted electricity for the first time in its history.
High-voltage transmission pylons at sunset
The School Today

Current State

An honest look at this area of the school as it stands today. This is the starting point every project on this page is measured against.
High-voltage transmission pylons at sunsetElectrical transmission infrastructureAerial view of the school campus and groundsA multi-storey residential block under construction
Project Scope
✓Hybrid solar power system
✓Gas-powered backup generation
✓Smart distribution network
✓Battery storage infrastructure
✓ICT/data center power redundancy
✓Smart energy monitoring
✓Street lighting modernization
✓Smart metering systems
Expected Outcomes
24h
Uninterrupted power for critical infrastructure
100%
Uptime guaranteed for digital systems
↓
Reduced diesel dependency
The Vision
A preview of what this project aims to achieve once fully delivered.
Electrical transmission infrastructure
The Problem
Weak power infrastructure across the campus
Heavy, costly dependence on diesel generators
Escalating utility costs that strain the school’s budget every year
High cost of power from the national grid, driving up operational expenses
No guaranteed uptime for digital systems, records or security infrastructure
The Solution
A hybrid solar power system with gas-powered backup generation
A dedicated smart distribution network with battery storage
Independent, solar-supported power redundancy for the data center, security systems and student records, so these can never go down
Smart energy and metering systems, plus modernised street lighting
Related causes

Building Lives Together

Workers laying water pipes in an open trench
Self-Sufficiency
₦300 Million

Water Treatment & Reticulation System

Borehole rehabilitation, an industrial-grade treatment plant and a smart reticulation network that guarantee clean, continuous water across the campus.
Roofing works underway on a hostel block
Infrastructure
₦1.8 Billion (Phases 1 & 2)

Hostel Renovation

A two-phase rehabilitation of student hostel blocks, bringing plumbing, electrical systems, security and comfort up to a modern standard.